Meana Petro

Drilling

Cement slurry & displacement volumes

Slurry volume, sack count, mix water and displacement volume for a primary cement job, from the geometry and the intended top of cement.

Inputs

Geometry

Use the caliper average where one exists.

Slurry

Results

Loading the calculation…

This calculation ran in your browser. No value you entered was sent anywhere, and nothing was stored.

How it is calculated

  • Annular volume = (hole area − casing area) × cemented length × (1 + excess).
  • Shoe track and rat hole are added; sacks = total slurry / yield; mix water = sacks × water per sack.
  • Displacement is the casing internal volume from surface to the float collar, so the shoe track stays cemented.
  • Class A, G, H and an extended lead slurry carry typical yields and water requirements; a laboratory blend report overrides them.

Where this stops being true

Volumes only. It says nothing about whether the cement will do its job: mud removal depends on centralisation, standoff, pipe movement and a spacer that actually displaces in turbulence, and a job with correct volumes and 40 % standoff still leaves a channel. Yields shift with additives and with mix-water salinity, so a job designed on these numbers must be re-checked against the blend report.

Related tools