Decline curve analysis
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
Production & lift
Bottom-hole pressure from a wellhead reading — a liquid gradient for oil and water, and a stepwise gas-column integration for gas.
Loading the calculation…
This calculation ran in your browser. No value you entered was sent anywhere, and nothing was stored.
Both branches assume a single-phase, static column. A shut-in oil well with gas in the top of the tubing is neither, and the answer will be wrong by the height of the gas cap; a wet gas well with liquid holdup is wrong the other way. Where the number matters — a reservoir pressure for material balance, a datum correction for mapping — run a wireline gauge and use this only to check it.
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
One well test turned into an inflow performance curve, a productivity index and an absolute open flow.
Fit a gas-lift performance curve through your injection tests and find both the technical peak and the point where the next MSCF stops paying for itself.
A Horner plot from your shut-in pressures, with the semilog slope turned into permeability, skin, p* and flow efficiency.