Meana Petro
DR-11FronteraOla 3IADominio

Diseño Automatizado del Programa de Perforación

En una frase

Drafts the casing, mud and BHA programme for a new well from the field’s own drilling history, for an engineer to review.

El problema

Writing a drilling programme takes an experienced engineer two to four weeks, and most of that time is spent re-deriving decisions that have already been made twenty times in the same field.

The institutional knowledge sits in the heads of a handful of people, several of whom are close to retirement.

Cómo funciona

Offset programmes and their outcomes are parsed into a structured decision record — casing seats against pore-pressure and fracture-gradient envelopes, mud systems against lithology, BHA against directional profile. A constraint solver proposes a programme; a retrieval layer attaches the specific offset evidence to every choice.

The output is a draft with citations, explicitly framed as a first pass for engineering review.

Datos necesarios

  • Offset drilling programmes, end-of-well reports and daily reports
  • Pore-pressure and fracture-gradient profiles
  • Casing and tubular inventory and standard designs
  • Well objective, target and surface location

Qué obtiene

  • Draft programme: casing scheme, mud plan, BHA sequence, hydraulics and time-depth curve
  • Evidence panel citing the offset wells behind each decision
  • Risk register generated from offset NPT events at equivalent depths

Qué no puede hacer

This drafts; it does not approve. Every output requires engineering review and sign-off, and the system will not produce a programme at all for a well outside the envelope of its offset set. In a genuinely new area it declines rather than extrapolating, which is deliberate.

Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.

Capacidades relacionadas

  • DR-04Intermedia

    Predicción de Estabilidad del Pozo

    Predicts the mud weight window that keeps the hole open — not too light and it caves, not too heavy and it fractures.

    Inteligencia de PerforaciónIADominio
  • DR-13Fundacional

    Causa Raíz de NPT y Consulta de Pozos Vecinos

    Reads every daily drilling report the operator has ever filed and answers, in seconds, what went wrong at this depth in this field before.

    Inteligencia de PerforaciónIA
  • DR-14Fundacional

    Trayectoria de Pozo y Anticolisión

    Checks the planned and actual well path against every other well on the pad, with the survey uncertainty included.

    Inteligencia de PerforaciónDominioTI
  • DR-03Frontera

    Permeabilidad a partir de Pérdidas de Lodo

    Mud that disappears into the formation is telling you something about how easily fluid moves through the rock. This reads that signal instead of discarding it.

    Inteligencia de PerforaciónIADominio