Conversor de unidades petroleras
Twenty-one families of upstream units, converted in one place — including the awkward ones like bbl/ft, psi/ft and millidarcy.
38
38 calculadoras de ingeniería que corren en tu navegador, en 7 grupos. Cada una declara su método y su límite, y ninguna envía tus números a ninguna parte.
Las conversiones que una jornada realmente necesita, incluidas las que no son un solo factor.
Twenty-one families of upstream units, converted in one place — including the awkward ones like bbl/ft, psi/ft and millidarcy.
°API, specific gravity and density at 15 °C from a density observed at any temperature, with the volume correction factor that gets you there.
Mud weight in any unit to a gradient and a hydrostatic pressure at any TVD — and the same calculation run backwards to an equivalent mud weight.
One date in three calendars, for the daily drilling report that is dated in one and the contractor report that is dated in another.
Volúmenes de pozo, hidráulica, surveys y aritmética de control de pozo.
Annular and string volumes section by section, then the strokes and the minutes to bottoms-up and to a full circulation.
Annular pressure loss, flow regime and the equivalent circulating density the formation actually sees while the pumps are running.
Total flow area, nozzle pressure drop, HSI and jet impact force — plus the nozzle size that would put the optimum share of pump pressure at the bit.
Paste MD, inclination and azimuth and get TVD, northings, eastings, dogleg severity, vertical section and closure — with the well path drawn.
Kill mud weight, initial and final circulating pressure and the step-down schedule, for rehearsal and for checking a sheet that has already been worked.
Apoyo de formaciónTurn a leak-off or integrity test into a fracture gradient, a maximum allowable mud weight and the surface pressure the shoe will take.
Sacks of barite to take a system from one mud weight to another, the volume it adds, and how much mud to discard if the pits cannot grow.
Slurry volume, sack count, mix water and displacement volume for a primary cement job, from the geometry and the intended top of cement.
Pick-up, slack-off and rotating hookload and surface torque from a survey, a string tally and a friction factor.
Declinación, influjo, desempeño de levantamiento y la aritmética de pruebas de pozo.
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
One well test turned into an inflow performance curve, a productivity index and an absolute open flow.
Fit a gas-lift performance curve through your injection tests and find both the technical peak and the point where the next MSCF stops paying for itself.
Bottom-hole pressure from a wellhead reading — a liquid gradient for oil and water, and a stepwise gas-column integration for gas.
A Horner plot from your shut-in pressures, with the semilog slope turned into permeability, skin, p* and flow efficiency.
Total dynamic head from net lift, tubing friction and discharge pressure, then the stages and shaft power that head implies.
Gross to net, cut to WOR, gas rate to GOR, and on-stream rates to calendar-day rates — the arithmetic every production report repeats and half of them get wrong.
Propiedades de fluidos, volúmenes originales, balance de materia y cribado de recuperación.
Bubble point, solution GOR, Bo, oil and gas viscosity, z-factor and Bg from gravity, temperature and pressure — the module the other reservoir tools call.
The volumetric equation run tens of thousands of times over triangular distributions, returning P90, P50 and P10 instead of one number that pretends to be certain.
Paste reservoir pressure against cumulative production and read gas in place off the intercept, with z computed at every point rather than assumed constant.
Ten EOR methods checked against your reservoir and fluid properties, each one told to say exactly which criterion rules it out.
CO₂ and lean-gas MMP from three independent correlations, corrected for injectant impurities, with the spread between them shown rather than averaged away.
Equipo rotativo, corrosión, resistencia de tubería y dimensionamiento de alivio.
BPFO, BPFI, BSF and FTF from bearing geometry and shaft speed, with the harmonics and the minimum spectrum Fmax you need to see them.
Two thickness readings turned into a short-term and a long-term rate, a remaining life and the next inspection date API 510 and 570 would set.
A metal-loss defect assessed by both original and modified B31G, giving the failure pressure, the safe operating pressure and the longest defect your MAOP can carry.
Required wall thickness and maximum allowable operating pressure under B31.3, B31.4 or B31.8, with the class location, joint and temperature factors applied.
Single-phase liquid by Darcy–Weisbach with a real Colebrook friction factor, and gas by Weymouth with both Panhandle equations alongside it.
Required orifice area for vapour or liquid relief, mapped onto the nearest API 526 standard orifice.
Vessel diameter and length from Souders–Brown gas capacity and liquid retention time, with the constraint that actually governs made visible.
Volúmenes venteados y quemados convertidos en las cifras que un reporte debe llevar.
A vented or fugitive gas volume converted to tonnes of methane and tonnes of CO₂ equivalent on both the 20- and 100-year horizons, with an OGMP 2.0 reporting level attached.
Flare volume per barrel, the CO₂ from combustion and the methane that slips through unburned — with the combustion efficiency as the dial that matters.
The lower and upper explosive limits of a multi-component gas, and where a measured atmosphere sits against them.
Dimensionar las partes aburridas de un programa digital antes de que alguien las firme.
Tag count, sample rate and retention turned into terabytes, plus the edge buffer you need to survive a link outage of a given length.
Pages and scan quality turned into storage, processing hours and — the part that actually sets the schedule — the size of the human review queue.
Tags, report rate and protocol turned into the kilobits per second a link has to carry — including the backfill surge after the link comes back.
Este cálculo se ejecutó en tu navegador. Ningún valor que introdujiste se envió a ningún sitio, y nada se guardó.