Asignación y Retroasignación de Producción
Splits the metered facility total back to individual wells with a documented, repeatable method instead of a spreadsheet nobody can audit.
Estimates each well’s oil, water and gas rate continuously from pressure and temperature, between the physical tests.
A well is physically tested once or twice a month, and that single measurement is carried as the well’s rate for the entire period. Any change in between is invisible, and allocation error accumulates against it.
A hybrid model couples a mechanistic multiphase flow calculation across the choke and tubing with a data-driven correction trained on the well’s own test history. Estimates carry uncertainty, and the model reports when it has drifted far enough from the last test to need a new one.
Virtual metering is a supplement to physical testing, not a replacement for it, and it should never be used as a fiscal measurement. Accuracy degrades when the well moves outside the conditions covered by its test history, particularly during rapid water-cut change, and choke Cv drift on eroded chokes is a persistent source of bias that only recalibration fixes.
Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.
Splits the metered facility total back to individual wells with a documented, repeatable method instead of a spreadsheet nobody can audit.
Runs the inflow-outflow calculation for every well in the field on a schedule, instead of for a few wells when someone has time.
Extracts fluid study data from decades of laboratory reports and tunes the equation of state against all of it, not against the one report someone had to hand.
Decides how to split a limited supply of lift gas across the wells that want it, to maximise oil rather than gas injected.
Predicts where wax, hydrate, scale or slugging will form in the flowline before the line blocks.