Meana Petro

Study leads, subsurface and facilities discipline managers, bid teams

Consultoras de Ingeniería

Your product is studies. Most of the study budget goes into finding and cleaning data rather than into engineering.

Qué es difícil hoy

  • Six weeks of a twelve-week study spent digitising PVT reports and reconciling well names
  • Client archives delivered as a hard drive of unsorted scans
  • No way to reuse the data preparation from the last study for the same field
  • Deliverables that cannot be audited back to source when the client challenges a number

Qué hacemos al respecto

  • Document OCR and structured extraction that turns a client archive into a queryable dataset in days
  • A PVT, well test and production repository that persists between studies
  • Automated well log QC and synthesis, which is usually the first two weeks of any subsurface study
  • Every extracted number carries a citation to its source page, so deliverables are auditable

Por dónde suele empezar

  • DF-01Fundacional

    Pipeline de OCR para Documentos de Campo

    Turns decades of scanned reports, logs and maps into searchable text, including Persian and Arabic documents and handwritten annotations.

    Fundamento de DatosIA
  • DF-02Fundacional

    Extracción Estructurada de Informes

    Pulls the numbers out of the reports — depths, rates, pressures, volumes, dates — and puts them into a database with a link back to the page they came from.

    Fundamento de DatosIADominio
  • SR-13Fundacional

    Modelado PVT y Ajuste de EOS

    Extracts fluid study data from decades of laboratory reports and tunes the equation of state against all of it, not against the one report someone had to hand.

    Inteligencia de Subsuelo y YacimientoDominioIA
  • SR-07Fundacional

    Control de Calidad y Síntesis de Registros

    Finds the bad intervals in the log archive and reconstructs curves that were never run, so the field has a complete set to work from.

    Inteligencia de Subsuelo y YacimientoIA

Preguntas que nos hacen

Can we deploy this per project?
Yes. A project-scoped deployment on your own infrastructure, with the client’s data segregated and removable at project close, is a supported configuration.
How much tuning does extraction need for a new client?
For common document types, little. For a client-specific report format with no equivalent in the trained set, expect a labelled sample of fifty to two hundred documents before extraction is reliable.