Análisis de curvas de declinación
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
Producción y levantamiento
Gross to net, cut to WOR, gas rate to GOR, and on-stream rates to calendar-day rates — the arithmetic every production report repeats and half of them get wrong.
Cargando el cálculo…
Este cálculo se ejecutó en tu navegador. Ningún valor que introdujiste se envió a ningún sitio, y nada se guardó.
A well test is one measurement of a well that changes hour to hour. Multiphase meters drift, test separators need a stable well to be accurate, and a cut measured on a slugging well depends entirely on when in the slug the sample was taken. Nothing here reconciles to an allocated figure — that is a field-wide calculation, and if this number and the allocation disagree, the allocation is what gets invoiced.
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
One well test turned into an inflow performance curve, a productivity index and an absolute open flow.
Fit a gas-lift performance curve through your injection tests and find both the technical peak and the point where the next MSCF stops paying for itself.
Bottom-hole pressure from a wellhead reading — a liquid gradient for oil and water, and a stepwise gas-column integration for gas.