Meana Petro

Production & lift

Rates, water cut, GOR & uptime

Gross to net, cut to WOR, gas rate to GOR, and on-stream rates to calendar-day rates — the arithmetic every production report repeats and half of them get wrong.

Inputs

Results

Loading the calculation…

This calculation ran in your browser. No value you entered was sent anywhere, and nothing was stored.

How it is calculated

  • Oil = gross × (1 − water cut); water = gross × water cut; WOR = water/oil.
  • GOR = gas (scf/d) / oil (STB/d); GLR uses gross liquid instead.
  • Calendar-day rates are on-stream rates multiplied by uptime — the number a yearly figure has to be built from.
  • Net oil applies the shrinkage between the test separator and the sales tank.

Standards it speaks

Where this stops being true

A well test is one measurement of a well that changes hour to hour. Multiphase meters drift, test separators need a stable well to be accurate, and a cut measured on a slugging well depends entirely on when in the slug the sample was taken. Nothing here reconciles to an allocated figure — that is a field-wide calculation, and if this number and the allocation disagree, the allocation is what gets invoiced.

Related tools

  • Decline curve analysis

    Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.

  • IPR curve

    One well test turned into an inflow performance curve, a productivity index and an absolute open flow.

  • Gas-lift injection optimisation

    Fit a gas-lift performance curve through your injection tests and find both the technical peak and the point where the next MSCF stops paying for itself.