Meana Petro
DR-15FronteraOla 3DominioIA

Soporte para Perforación con Presión Gestionada

En una frase

Helps hold bottom-hole pressure inside a narrow window by predicting what the choke needs to do before the transient arrives.

El problema

Managed pressure drilling is chosen precisely where the mud-weight window is too narrow for conventional drilling. Connections, pump ramps and trips are exactly when the window is hardest to hold.

Reactive choke control always lags the transient it is responding to.

Cómo funciona

A transient hydraulic model is run ahead of real time, predicting annular pressure response to the scheduled operation — connection, pump ramp, trip — and issuing a feed-forward choke setpoint. Measured response continuously re-tunes the model’s friction and compressibility parameters.

Integration with the MPD control system is supervisory and vendor-specific; the safety interlocks remain entirely with the MPD vendor’s own system.

Datos necesarios

  • MPD system telemetry: choke position, back-pressure, flow-out
  • Downhole pressure from PWD where available
  • Rig hydraulics data and mud compressibility characterisation
  • Operational schedule from the rig activity feed

Qué obtiene

  • Feed-forward choke setpoint and predicted bottom-hole pressure trace
  • Connection and trip pressure-management plan
  • Window-excursion log with cause attribution

Qué no puede hacer

This is frontier and it is supervisory only. It never takes control authority from the MPD vendor’s safety system. Transient model accuracy degrades sharply in gas-influx conditions and with oil-based mud at high temperature, where compressibility is poorly characterised, and in those conditions the system reverts to advisory display.

Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.

Capacidades relacionadas

  • DR-02Intermedia

    Detección Temprana de Influjo y Control de Pozo

    A kick is formation fluid entering the wellbore. Left unchecked it becomes a blowout. This watches eleven sensor streams and warns the crew minutes earlier than pit-volume alarms do.

    Inteligencia de PerforaciónIAIoT
  • DR-04Intermedia

    Predicción de Estabilidad del Pozo

    Predicts the mud weight window that keeps the hole open — not too light and it caves, not too heavy and it fractures.

    Inteligencia de PerforaciónIADominio
  • DR-03Frontera

    Permeabilidad a partir de Pérdidas de Lodo

    Mud that disappears into the formation is telling you something about how easily fluid moves through the rock. This reads that signal instead of discarding it.

    Inteligencia de PerforaciónIADominio
  • DR-09Frontera

    Geonavegación Asistida por IA

    Keeps the horizontal well inside the target layer by continuously re-matching the measured logs to the geological model.

    Inteligencia de PerforaciónIADominio