Meana Petro
OP-02FundacionalOla 2TI

Permiso de Trabajo Electrónico y LOTO

En una frase

Moves permits and isolation certificates off paper, so conflicting work on the same equipment is blocked automatically rather than caught by memory.

El problema

Paper permit systems depend on the permit coordinator holding the whole picture in their head. Conflicting isolations, expired permits and incomplete reinstatement are found during audits, and occasionally during incidents.

Cómo funciona

Permits, isolations and job safety analyses are managed digitally against the equipment register, with automatic conflict detection across concurrent permits on the same or interlocked equipment. Approvals are role-based and time-bound, and reinstatement is tracked to closure rather than assumed.

Datos necesarios

  • Equipment register with isolation points and interlock relationships
  • Permit types, approval roles and the operator’s safety procedures
  • Personnel competency and authorisation records
  • Integration with the maintenance work order system

Qué obtiene

  • Digital permits and isolation certificates with automatic conflict blocking
  • Live board of active permits by area and equipment
  • Audit trail of every approval, extension and reinstatement

Qué no puede hacer

Conflict detection is only as good as the interlock and isolation-point model behind it, and building that model for an existing facility is a substantial engineering effort that must be done before go-live. Deploying this with an incomplete equipment model produces false confidence, which is worse than the paper system it replaced.

Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.

Capacidades relacionadas

  • OP-01Fundacional

    Captura de Datos de Campo Offline-First

    Operators record readings and observations on a phone that works with no signal, and everything syncs when the device gets back to coverage.

    Digitalización de OperacionesTI
  • HS-06Fundacional

    Seguimiento de Personal y Activos

    Knows who is on site and roughly where, so a muster after an alarm takes minutes instead of a headcount by radio.

    HSE, Emisiones y SeguridadIoTTI
  • OP-03Fundacional

    Integración CMMS / ERP

    Connects the platform’s predictions to the systems that actually create work orders and order parts, so an alert becomes a scheduled job.

    Digitalización de OperacionesTI
  • OP-07Fundacional

    Centro Integrado de Operaciones

    One room, and one screen layout, where production, drilling, maintenance and HSE see the same numbers at the same time.

    Digitalización de OperacionesTI