Meana Petro
SR-08FronteraOla 3IADominio

Optimización de Estrategia EOR/IOR

En una frase

Searches injection strategies — what to inject, where, and at what rate — against recovery and cost together.

El problema

EOR screening usually compares three or four pre-selected schemes because each evaluation costs a simulation campaign. The optimum is rarely one of the four.

Cómo funciona

The proxy simulator is placed inside a multi-objective optimiser that searches injectant, pattern, rate and timing against recovery factor and discounted cost. The Pareto front is presented to the team rather than a single recommended scheme.

Datos necesarios

  • History-matched model ensemble
  • PVT and fluid characterisation including injectant compatibility
  • Injectant availability and cost, including CO2 or gas source constraints
  • Facilities and injection capacity limits

Qué obtiene

  • Pareto front of strategies across recovery and NPV
  • Sensitivity ranking of the decision variables
  • Pilot design recommendation with the decision it is meant to resolve

Qué no puede hacer

Everything here inherits the proxy’s limits and the history match’s biases. Chemical EOR in particular depends on laboratory parameters — adsorption, degradation at reservoir temperature — that simulation handles crudely, and a favourable simulated result for a chemical flood should be treated as a reason to run a core flood, not as a decision.

Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.

Capacidades relacionadas

  • SR-01Frontera

    Simulación de Yacimiento con Proxy Inteligente

    A learned stand-in for the full reservoir simulator that answers in seconds instead of hours, so an engineer can test fifty scenarios instead of three.

    Inteligencia de Subsuelo y YacimientoIADominio
  • SR-09Fundacional

    Cribado de Métodos EOR

    Rules out the EOR methods that cannot work in this reservoir before anyone spends a year simulating them.

    Inteligencia de Subsuelo y YacimientoDominioIA
  • SR-15Frontera

    Optimización del Plan de Desarrollo de Campo

    Evaluates whole development concepts — well count, phasing, facility size — as one connected problem instead of four separate studies.

    Inteligencia de Subsuelo y YacimientoDominioIA
  • SR-02Frontera

    Ajuste Histórico Automatizado

    Tunes the reservoir model until it reproduces what the field actually produced, automatically and with the uncertainty kept rather than discarded.

    Inteligencia de Subsuelo y YacimientoIADominio