Meana Petro
SR-14FundacionalOla 2DominioIA

Estimación Automatizada de Reservas y DCA

En una frase

Fits decline curves across every well in the field on a consistent basis and keeps the audit trail that a reserves report needs.

El problema

Annual reserves work is a spreadsheet campaign in which each engineer fits curves by eye with different assumptions about downtime, and the auditor spends most of the review reconstructing what was done.

Cómo funciona

Automated fitting applies Arps and modified hyperbolic models with consistent rules for downtime handling, segment selection and terminal decline. Every fit stores its parameters, the data window used and who approved it, so the audit trail is a by-product rather than a separate exercise.

Datos necesarios

  • Monthly or daily production by well with downtime recorded separately
  • Well event history: workovers, artificial-lift changes, choke changes
  • Economic limit assumptions
  • Prior reserves booking for continuity

Qué obtiene

  • EUR by well with fit parameters and diagnostic plots
  • Field roll-up by reserves category with change reconciliation year over year
  • Audit package with every assumption and approval recorded

Qué no puede hacer

Decline analysis assumes the future resembles the fitted past under unchanged operating conditions. It has no view on a change in artificial lift, an infill campaign or a facility constraint, and it will fit a confident curve to a well whose decline is entirely caused by a partially closed choke. Event history is therefore mandatory input, not optional.

Cada página de capacidad declara una limitación real. Si un proveedor no puede decirle dónde termina su producto, no le están diciendo la verdad sobre dónde empieza.

Capacidades relacionadas

  • SR-11Intermedia

    Pronóstico con Incertidumbre

    Produces P10, P50 and P90 production forecasts whose spread is calculated, not chosen to look reasonable.

    Inteligencia de Subsuelo y YacimientoIA
  • PR-01Fundacional

    Pronóstico de Producción

    Forecasts what each well will produce next month, and tells you which wells it is not confident about.

    Producción y Levantamiento ArtificialIA
  • SR-07Fundacional

    Control de Calidad y Síntesis de Registros

    Finds the bad intervals in the log archive and reconstructs curves that were never run, so the field has a complete set to work from.

    Inteligencia de Subsuelo y YacimientoIA
  • SR-09Fundacional

    Cribado de Métodos EOR

    Rules out the EOR methods that cannot work in this reservoir before anyone spends a year simulating them.

    Inteligencia de Subsuelo y YacimientoDominioIA
  • SR-13Fundacional

    Modelado PVT y Ajuste de EOS

    Extracts fluid study data from decades of laboratory reports and tunes the equation of state against all of it, not against the one report someone had to hand.

    Inteligencia de Subsuelo y YacimientoDominioIA