مانا بترو

المنهجية

تقييم، تجربة، نشر، توسّع — مع معيار خروج مكتوب قبل بدء كل مرحلة.

  1. 01

    التقييم

    المدة: ٤–٦ أسابيع

    We find out what your data can actually support before either of us commits to anything.

    ما الذي يحدث

    • Inventory every relevant data source and measure its quality against specific capability requirements
    • Interview operations, engineering and IT to establish what decisions the platform needs to support
    • Score readiness per capability and identify the blocking gap for each
    • Size the remediation work that would unblock the highest-value capabilities

    ما الذي تستلمه

    • Readiness score per capability with the specific gap named
    • Prioritised remediation plan with effort and sequence
    • A recommended first wave of two to four capabilities with a realistic value estimate
    • A written statement of what is not viable in this field today

    معيار الخروج

    The operator can decide to proceed, to remediate first, or to stop — with enough evidence to defend any of the three.

  2. 02

    التجربة

    المدة: ٣–٤ أشهر

    Two capabilities, one asset, a measurable result and a defined way to fail.

    ما الذي يحدث

    • Deploy the platform core and the first two capabilities on a single field or facility
    • Run models in shadow mode against live data before anything is acted on
    • Establish the measurement baseline before the capability changes behaviour
    • Train the users who will operate it and capture their feedback weekly

    ما الذي تستلمه

    • Working deployment on the operator’s own infrastructure
    • Measured result against the pre-agreed baseline
    • An honest account of what did not work and why
    • A go / no-go recommendation with the evidence behind it

    معيار الخروج

    A pre-agreed success metric is either met or not. A pilot that fails its metric ends, and we say so rather than proposing an extension.

  3. 03

    النشر

    المدة: ٦–١٢ شهراً

    Production hardening, integration with the systems that create work, and handover to people who will still be here in three years.

    ما الذي يحدث

    • Harden the deployment: high availability, backup, disaster recovery, security review
    • Integrate with maintenance, ERP and reporting systems so recommendations become work
    • Extend to the remaining assets in scope
    • Train the operator’s own team to run and maintain the platform

    ما الذي تستلمه

    • Production platform with documented operating procedures
    • Integrations live with the systems that execute the work
    • Trained operator team with defined roles and responsibilities
    • Model governance process with monitoring and retraining triggers

    معيار الخروج

    The operator’s own team can run, monitor and troubleshoot the platform without us in the room.

  4. 04

    التوسع

    المدة: مستمر

    More capabilities, more assets, and a measured account of which ones are earning their place.

    ما الذي يحدث

    • Add capabilities in sequence as the data foundation supports them
    • Extend across fields, with the model governance process carried forward
    • Track realised value per capability and retire the ones that do not earn it
    • Transfer capability development to the operator’s own team where they want it

    ما الذي تستلمه

    • Expanded capability portfolio with realised-value tracking
    • Cross-field benchmarking on a common data basis
    • Capability retirement decisions where the value did not appear
    • Knowledge transfer and, where agreed, source access

    معيار الخروج

    There is no exit. This is the state the platform lives in, and the honesty about which capabilities are not working is what keeps it healthy.