خواص PVT من الارتباطات
Bubble point, solution GOR, Bo, oil and gas viscosity, z-factor and Bg from gravity, temperature and pressure — the module the other reservoir tools call.
المكمن
Ten EOR methods checked against your reservoir and fluid properties, each one told to say exactly which criterion rules it out.
يجري تحميل الحساب…
جرى هذا الحساب داخل متصفحك. لم يُرسل أي رقم أدخلته إلى أي جهة، ولم يُحفظ شيء.
Screening criteria are a summary of where projects have been done, and they carry every bias of that record: they are dominated by North American sandstones, they say little about fractured carbonates, and they encode 1990s technology. They also ignore everything that actually decides an EOR project — CO₂ supply, water chemistry, surfactant cost at reservoir salinity, well spacing, and whether the field has the surface plant to handle the produced fluid. A method inside the window is a candidate for a pilot, nothing more.
Bubble point, solution GOR, Bo, oil and gas viscosity, z-factor and Bg from gravity, temperature and pressure — the module the other reservoir tools call.
The volumetric equation run tens of thousands of times over triangular distributions, returning P90, P50 and P10 instead of one number that pretends to be certain.
Paste reservoir pressure against cumulative production and read gas in place off the intercept, with z computed at every point rather than assumed constant.
CO₂ and lean-gas MMP from three independent correlations, corrected for injectant impurities, with the spread between them shown rather than averaged away.