مانا بترو
SR-15متقدمةالموجة 3المجالالذكاء الاصطناعي

تحسين خطة تطوير الحقل

في جملة واحدة

Evaluates whole development concepts — well count, phasing, facility size — as one connected problem instead of four separate studies.

المشكلة

Subsurface picks the well count, facilities sizes the plant for it, and economics evaluates the result. Each hands over a fixed answer, so the coupling between them — which is where most of the value sits — is never explored.

كيف تعمل

A coupled model links subsurface forecast, facility capacity, drilling schedule and cash flow, and an optimiser searches concepts across well count, phasing, plant capacity and injection strategy. Results are presented as a concept-comparison surface with the dominant trade-off named.

البيانات المطلوبة

  • History-matched or exploration-phase model ensemble
  • Facility cost and capacity curves
  • Rig availability, drilling durations and campaign constraints
  • Fiscal terms and price assumptions

ما الذي تحصل عليه

  • Concept comparison across NPV, recovery, peak rate and capital exposure
  • Optimal phasing and facility sizing per concept
  • Decision-quality summary identifying which uncertainty actually changes the choice

ما لا تستطيع فعله

The optimiser is only as credible as the cost curves it is given, and early-phase facility cost estimates carry error bands wider than the differences between the top concepts. Used to rank concepts and identify the decisive uncertainty it is valuable; used to produce a single NPV number for an investment case it is misleading, and we do not supply it for that purpose.

كل صفحة قدرة تذكر حداً حقيقياً. إن لم يستطع المورّد إخبارك أين يتوقف منتجه، فلم يُقل لك الحق عن أين يبدأ.

قدرات ذات صلة

  • SR-10متقدمة

    تحديد مواقع آبار التطوير

    Searches for where the next wells should go, with drilling feasibility and surface constraints inside the search rather than applied afterwards.

    ذكاء تحت السطح والمكامنالذكاء الاصطناعيالمجال
  • OP-05متوسطة

    تخطيط لوجستيات الحقل

    Plans crew, vehicle and material movements across the field so that fewer kilometres are driven, which is also the largest safety exposure most operators have.

    رقمنة العملياتالذكاء الاصطناعيتقنية المعلومات
  • SR-02متقدمة

    المطابقة التاريخية الآلية

    Tunes the reservoir model until it reproduces what the field actually produced, automatically and with the uncertainty kept rather than discarded.

    ذكاء تحت السطح والمكامنالذكاء الاصطناعيالمجال