مانا بترو

Plant managers, reliability and integrity engineers, HSE leadership

مشغّلو المنشآت والقطاع الأوسط

Rotating equipment, pipelines and emissions reporting — all three are now measurable continuously rather than on a route.

ما هو صعب اليوم

  • Quarterly vibration routes that miss failures developing in between
  • Inspection budgets allocated by inherited intervals rather than by risk
  • Methane reporting built from emission factors when the regulator is asking for measurements
  • Energy as one of the largest costs and one of the least measured

ما الذي نفعله حياله

  • Continuous condition monitoring with defect-specific alerts, not just a rising vibration number
  • Risk-based inspection planning with a documented, auditable basis for every interval
  • OGMP 2.0 methane inventory built from source and site measurement where it exists, with the gap to the next level stated plainly
  • Energy intensity per barrel, disaggregated to the equipment that is actually drifting

من أين يبدأ هذا عادةً

  • FA-01أساسية

    مراقبة حالة المعدات الدوارة

    Listens to pumps, compressors and turbines continuously and identifies the specific defect — bearing, imbalance, misalignment, looseness — from the vibration signature.

    المنشآت والمعدات الدوارة والسلامة الهيكليةإنترنت الأشياءالذكاء الاصطناعي
  • FA-02أساسية

    الصيانة التنبؤية وفق ISO 14224

    Puts every piece of equipment into one reliability taxonomy so that failure rates mean the same thing across all fields, and maintenance is planned from them.

    المنشآت والمعدات الدوارة والسلامة الهيكليةالذكاء الاصطناعيتقنية المعلومات
  • FA-05أساسية

    تخطيط الفحص القائم على المخاطر

    Allocates a fixed inspection budget to the equipment where failure would hurt most and is most likely, with the reasoning written down.

    المنشآت والمعدات الدوارة والسلامة الهيكليةالمجالالذكاء الاصطناعي
  • HS-03متوسطة

    مراقبة الميثان والإبلاغ وفق OGMP 2.0

    Builds a methane inventory from measurements rather than from emission factors, at the level of detail OGMP 2.0 actually asks for.

    الصحة والسلامة والبيئة والانبعاثات والأمنالذكاء الاصطناعيالمجال

أسئلة تُطرح علينا

Do we need to replace our control system?
No. Acquisition is read-only over OPC UA or the historian API across a defined conduit. We never write to a controller.
Can you reach OGMP 2.0 level 5 with our existing equipment?
Probably not, and we will say so. Levels 4 and 5 require site-level measurement most operators do not have. We produce the best inventory your current measurement supports and specify exactly what equipment closes the gap.