تحليل منحنى الانحدار
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
الإنتاج والرفع
Fit a gas-lift performance curve through your injection tests and find both the technical peak and the point where the next MSCF stops paying for itself.
يجري تحميل الحساب…
جرى هذا الحساب داخل متصفحك. لم يُرسل أي رقم أدخلته إلى أي جهة، ولم يُحفظ شيء.
A performance curve fitted from field tests is only valid at the conditions those tests were run in. Raise the separator pressure, cut the water or deepen the injection point and the curve moves. It also assumes the well is stable at every rate, which gas-lifted wells frequently are not — a well heading between two states will give two different rates at the same injection and both will be recorded as tests.
Paste a rate history and get an Arps fit — qi, Di and b — with the time to the economic limit, remaining reserves and an EUR.
One well test turned into an inflow performance curve, a productivity index and an absolute open flow.
Bottom-hole pressure from a wellhead reading — a liquid gradient for oil and water, and a stepwise gas-column integration for gas.
A Horner plot from your shut-in pressures, with the semilog slope turned into permeability, skin, p* and flow efficiency.