أحجام البئر وزمن الدوران
Annular and string volumes section by section, then the strokes and the minutes to bottoms-up and to a full circulation.
الحفر
Kill mud weight, initial and final circulating pressure and the step-down schedule, for rehearsal and for checking a sheet that has already been worked.
هذه أداة تدريب ومراجعة، لا وثيقة تشغيلية. الورقة المعتمدة في الموقع هي الوحيدة المعتبرة.
يجري تحميل الحساب…
جرى هذا الحساب داخل متصفحك. لم يُرسل أي رقم أدخلته إلى أي جهة، ولم يُحفظ شيء.
This is a rehearsal and review aid. It is not a well-control document and must not be used to kill a well. It assumes a vertical single-bubble influx, one uniform annulus, a constant pump efficiency and no migration while the sheet is being worked — none of which hold on a live well. The controlled kill sheet on the rig, filled in and signed by the people on tour, is the only sheet that counts.
Annular and string volumes section by section, then the strokes and the minutes to bottoms-up and to a full circulation.
Annular pressure loss, flow regime and the equivalent circulating density the formation actually sees while the pumps are running.
Total flow area, nozzle pressure drop, HSI and jet impact force — plus the nozzle size that would put the optimum share of pump pressure at the bit.
Paste MD, inclination and azimuth and get TVD, northings, eastings, dogleg severity, vertical section and closure — with the well path drawn.